Building your own home is a dream for many New Zealanders, but it can also feel overwhelming without a clear roadmap. That’s why Frame Homes emphasizes transparency and client involvement at every step. Whether you’re a first-time buyer or planning your forever home, knowing what to expect can make the journey smoother and more rewarding. In this guide, we break down the full construction process with Frame Homes, offering insight into building stages in NZ, what timelines to anticipate, and how each step brings you closer to the front door.
1. Pre-Construction: Planning and Design
Before the first nail is hammered, planning begins. Frame Homes works closely with you to finalize your design, budget, and land requirements.
Key activities during this stage:
Site analysis and land preparation
Architectural design finalization
Consents and council approvals
Budget and construction contract agreement
This is where your vision takes form on paper. Open communication during this stage helps align expectations and establish a realistic Frame Homes timeline.
2. Groundworks and Foundation
Once consents are approved, groundwork begins. This phase ensures that your build is structurally sound from the bottom up.
Typical steps:
Site clearing and excavation
Laying plumbing and drainage systems
Pouring the concrete foundation or floor slab
This stage usually spans 2–3 weeks depending on weather and soil conditions.
3. Framing and Exterior Structure
This is where your house begins to look like a house. The iconic timber framework, for which Frame Homes is known, is erected, forming the backbone of your structure.
Includes:
Wall and roof framing
Installation of trusses
Exterior cladding and roof installation
This phase typically takes 3–4 weeks and is essential for providing strength and durability.
4. Interior Work and Services
With the shell complete, attention shifts indoors. This stage involves fitting the home with vital services and internal structures.
Activities include:
Electrical and plumbing installation
Insulation and plasterboard
Windows and internal doors
Painting and initial fit-out
This phase allows the house to become functional and habitable.
5. Final Fit-Out and Completion
The final stage is all about finishing touches. Fixtures, appliances, and flooring go in, and final inspections ensure everything meets NZ building code standards.
Final steps:
Kitchen and bathroom installation
Flooring and cabinetry
Final quality inspection
Client walk-through and handover
Once approved, your new home is ready for move-in.
Why Choose Frame Homes?
Frame Homes offers more than just a build they provide a guided, transparent experience. With consistent communication, expert craftsmanship, and a defined home building process, buyers are always informed and involved. Whether you’re comparing building stages in NZ or assessing timelines, Frame Homes helps reduce surprises and ensure a smooth construction experience from concept to completion.
Conclusion
Understanding the construction process empowers you to make confident decisions throughout your home-building journey. Frame Homes believes in educating and partnering with clients — not just building houses but building trust. From blueprint to build, their process is designed to keep you informed, prepared, and excited every step of the way. Visit our store or contact the Frame Homesteam to start planning your dream home today.
FAQs About the Construction Process
Q1: How long does the average build with Frame Homes take?Most builds take between 6 to 9 months, depending on complexity, consents, and weather conditions.Q2: Can I customize the layout or design during the build?Changes are possible but are best made during the planning phase to avoid delays and extra costs.Q3: What type of foundation does Frame Homes use?Depending on the land and design, homes may use a concrete slab or timber piles. Your consultant will advise the best option.Q4: Is financing available through Frame Homes?While Frame Homes does not offer direct financing, they can connect you with trusted mortgage advisors to explore your options.Q5: When do I make payments during the build?Payments are typically scheduled across construction milestones. Your contract will outline a clear payment structure.